TOVP Architecture Dept. Report: July, 2022
Thu, July 14, 2022
by Vilasini Devi Dasi
TOVP Architecture Dept. Report From the Head Architect The TOVP is a project that perpetually works on multiple paradigms at once: design, working drawings, and material research whilst simultaneously casting elements all across the country and building them coherently in Mayapur. The design team makes sure to put thought into the minutest detail to ensure
- Published in Architecture Dept. Reports
Tagged under:
Architecture Dept. Report
TOVP Architecture Department Report, June 2022: Traveling Through the TOVP
Sat, June 25, 2022
by Aishvarya Jadav
From the Head Architect Every space matters. Every line drawn on the AutoCAD defines that space. With great deliberation and calibration the drawings are released on the site one after another after another after another… With a total amounting to over 8,000 detail drawings, we gear up towards the upcoming milestones. Refining, reforming, evolving …and
- Published in Architecture Dept. Reports
Tagged under:
Weekly Inhouse Progress Report
TOVP Architecture Department Report – March, 2022
Sat, March 26, 2022
by Dipti Bhalerao
We are in that phase of the project where the architectural drawings, although complete, are entering their next re-construction phase. This phase (often referred to as the ‘Invisible Phase’) is to ensure that the minutest inch increase in the brick and plaster is re-constructed in the drawing, because it has a domino impact on the
- Published in Architecture Dept. Reports
Tagged under:
Weekly Inhouse Progress Report
TOVP Architecture Department Report, November, 2021 – Painting a Vision
Fri, December 17, 2021
by Dipti Bhalerao
From door knobs to big domes – the work continues on. Adjustments, refinements and accuracy on the drawings to fit the site conditions are in full swing for various elements of this grand building. Sharing some Architectural frames in this TOVP Architecture Department report. Hope all devotees are keeping well and praying that we can
- Published in Architecture Dept. Reports
Tagged under:
Weekly Inhouse Progress Report
TOVP Architecture Department Report – Picking Up the Momentum
Sat, September 04, 2021
by Vilasini Devi Dasi
A lot of progress has been made in the Staircase Towers – exterior and interior – design and execution. In-depth items have been captured in relation to the varied disciplines such as lighting, cladding, ornamentation, jalis, etc associated with the Staircase Towers. As the construction shapes up, the drawings tune in to achieve just the
- Published in Architecture Dept. Reports
Tagged under:
Weekly Inhouse Progress Report
Pankajanghri Prabhu Memoir from the TOVP Architecture Department
Sun, June 27, 2021
by Vilasini Devi Dasi
The appropriate time to glorify a special soul is ‘always’. It has been more than a month that our beloved Pankajanghri prabhu has left this planet. His memories and contributions towards the TOVP are eternally etched in our hearts and in the walls of this iconic building. The TOVP Team members in the Design and
- Published in Architecture Dept. Reports
Tagged under:
Weekly Inhouse Progress Report
TOVP – Answers to Questions About Temple Design
Mon, June 07, 2021
by Sunanda Das
In a recent TOVP video entitled, A Look Inside the Completed Temple of the Vedic Planetarium, which went quite viral on YouTube, there were a number of comments saying that the temple design looked more like a mosque or had a European or Western feel like a Cathedral or church, rather than a Vedic emphasis.
- Published in Architecture Dept. Reports
Tagged under:
Weekly Inhouse Progress Report
TOVP Architecture Department Report – Now and the Coming
Sat, March 20, 2021
by Vilasini Devi Dasi
Current and Future Works: January – February, 2021 While capturing the works undertaken currently in the Architectural Department, we have worked out a wonderful solution for increasing the treads of the grand staircase at the building entrance. The tread size is now very comfortable for the footfall of devotees. Soon we will be implementing it
- Published in Architecture Dept. Reports
Tagged under:
Weekly Inhouse Progress Report
TOVP Architecture Department 2020 Report
Tue, January 26, 2021
by Vilasini Devi Dasi
Sounds of drilling machines, hammers, and marbles. Smells of wet concrete, and dust of cutting stones. Sights of scaffolding and busy helmets appear like the movement of ants amidst blue domes – all comes to an uncertain halt. Organize… plan… and then execute. A job well planned is half the job done! The difference between
- Published in Architecture Dept. Reports
Tagged under:
Weekly Inhouse Progress Report