TOVP Architecture Department Report – March, 2022
Sat, March 26, 2022
by Dipti Bhalerao
We are in that phase of the project where the architectural drawings, although complete, are entering their next re-construction phase. This phase (often referred to as the ‘Invisible Phase’) is to ensure that the minutest inch increase in the brick and plaster is re-constructed in the drawing, because it has a domino impact on the
- Published in Architecture Dept. Reports
Tagged under:
Weekly Inhouse Progress Report
TOVP Architecture Department Report, November, 2021 – Painting a Vision
Fri, December 17, 2021
by Dipti Bhalerao
From door knobs to big domes – the work continues on. Adjustments, refinements and accuracy on the drawings to fit the site conditions are in full swing for various elements of this grand building. Sharing some Architectural frames in this TOVP Architecture Department report. Hope all devotees are keeping well and praying that we can
- Published in Architecture Dept. Reports
Tagged under:
Weekly Inhouse Progress Report