Action at the ToVP is creating a stir as onlookers stop and watch the new crane being assembled.
This crane will reach more than 100 M, the second of the pair now on site to build the large domes. The road between the ToVP and the adjacent Long building has been temporarily blocked off as the large pieces of the crane are hoisted into the air and slowly put together to build the epic piece of machinery. While the crane is being erected in preparation for the domes achieving new heights, so are new materials being brought in with the same intentions. New stainless steel has arrived from Delhi and it will be used for the gigantic domes adorning the new temple. The next step is putting it together and watching the steel transform into these landmark domes.