Within the last few days we have begun the preparation work for installing the remaining two Kalashes and Chakras onto both the Main and Nrsimhadeva domes. This consists of mounting the power frames which will hold the Kalashes and Chakras in place.
Nrsimhadeva’s dome is now ready for the Russian engineers to begin working.The stainless steel pipe frame (each has a diameter of 80-140mm/3-6”) has been mounted, along with all 16 GRC (Glass Reinforced Concrete) brackets that will hold the Kalash. The scaffolding has been raised to working level.
For the Main dome, preparation work is underway to mount the same steel pipe frame. All the preparatory work is planned to be completed by mid-October, which will be followed by the mounting of both Kalashes by the Russian engineers.